Brian Milnes, the chairman of the Greater Cambridge Partnership (GCP) which installed the bright red, third-of-a-mile-long scheme, revealed its future depended on a trial period.
Source link : https://www.dailymail.com/news/article-15855403/Controversial-2-4-million-cycle-street-torn-trial-period-admits-head-organisation-built-it.html?ns_mchannel=rss&ito=1490&ns_campaign=1490
Author :
Publish date : 2026-05-28 17:01:00
Copyright for syndicated content belongs to the linked Source.
Controversial £2.4 million cycle street could be torn up after trial period, admits head of organisation that built it
