The Washington Post

Maryland to part ways with Key Bridge contractor after disagreement on cost



The decision to “off-ramp” Kiewit Infrastructure came after negotiations failed to close a gap between the company’s proposal to build the bridge and what state officials believe is acceptable.



Source link : https://www.washingtonpost.com/dc-md-va/2026/04/28/key-bridge-rebuilt-sean-duffy/

Author : Steve Thompson, Katie Mettler

Publish date : 2026-04-28 21:48:00

Copyright for syndicated content belongs to the linked Source.

Tags : The Washington Post